Sorain starts up its new BIOMATIC in Spain for the composting of FORSU and other biomasses in Guadassuar
Sorain Cecchini Tecno has built a composting line next to the Valorisation of Urban Waste complex of Guadassuar in Valencia, for the automatic treatment of FORS and other biomasses with its new Biomax family bioreactor for small and medium capacity installations.
This new model retains all the advantages of the Biomax-G, already implemented with more than 30 units in Spain, treating more than 1.5 Mt per year of organic fraction (FORS, digestate, MOR, sludge, agri-food waste, etc.).
Its compact dimensions and low management costs make it an extremely competitive system for small and medium scale operations, from 5,000 to 50,000 tonnes per year.
The Biomatic is characterised by:
- Available from 12 to 25m wide and from 20 to 60m long.
- 100% automatic, electric and PV-driven
- Zero leachate
- Compact and suitable for installations on industrial estates
- Modular and scalable
- SANDACH compliance
Sorain Cechinni Tecno participates in the Renewable Gas Exhibition.
More info
https://www.retema.es/revista-digital/noviembre-diciembre-8
www.sctecno.com/es